User Tools

Site Tools


2014_spring_cleanup

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
2014_spring_cleanup [2014/04/08 18:15]
tyisi
— (current)
Line 1: Line 1:
-====== 2014 Alternative Spring Cleanup ====== 
- 
-===== To Do ===== 
-  * Run (extra/​temporary) network cables from the ceiling to the worktables. 
-  * Do an inventory of the power distribution around the space. 
-  * Do an inventory of/label all the containers to their respective shelves. 
-  * Take an inventory of/label stuff that can be removed or needs further sorting/​attention. 
-  * Remove all of the boxes from the floor and vacuum/​remove dustbunnies. 
-  * Mop the floors. 
- 
-===== In Progress ===== 
-  * Clean up the clutter around the space. 
-  * Create a breaker separation for the kitchen area. (Waits on zipties.) 
- 
-===== Done ===== 
-  * Fastened the drawer handles for the cupboard under the electrical panels. (Brock) 
-  * Cleanup cable boxes (Inez & Ty) 
-  * Relabeled all the shelves (Ty) 
-  * Setup a filing system for the laser cutter wood in the workshop. (Daniel, Brock, Ty) 
- 
-===== Shopping list ===== 
-  * Latex gloves 
-  * Nitrile gloves (for nastier chemicals) 
-  * (Big) Tie-wraps (Tie-zips) 
-  * All-Purpose Cleaner 
-  * Masking Tape 
-  * Cable-tie velcro 
- 
-===== Policy ===== 
-We are moving to the "​parking ticket"​ system. 
- 
-Items marked with this label is unknown and in the way. 
- 
-All items marked with a parking ticket must be claimed, labelled with contact information,​ and put in a logical area. 
  
2014_spring_cleanup.1396980938.txt.gz ยท Last modified: 2014/04/08 18:15 by tyisi